Sheet 18Construction progress

The site, building by building, as the engineer certifies it

Every week the site reports its progress; the engineering firm that supervises the works checks and certifies it, and the technical control body gives its opinion at each stage. Certified stages trigger your calls for funds, never the reported progress.

The phase 3 site one morning: a completed structure, the crane above, two engineers at the foot of the building.

Three phases, three moments of the works

  1. 1

    Phase 1, west of the ravine

    Lived in

    Every home has been handed over.

  2. 2

    Phase 2, along the boulevard

    Handovers under way

    7 buildings tracked · 98 % certified on average

    Planned handover: 10/01/2027

  3. 3

    Phase 3, east slope

    On sale, works under way

    10 buildings tracked · 18 % certified on average

    Planned handover: 10/12/2028

Where each building stands

The solid bar is the certified progress, the light bar what the site reports, the tick what the schedule planned for today. Choose a building for its detail.

Certified by the engineerReported by the sitePlanned for today

Villas V3-A, stage by stage

The building's eleven stages, each in its planned window. Each column rises to the reported progress; the dark line marks what the engineer has certified.

Certified
15 %
Reported
19 %
Planned today
20 %
Current stage
Structure
  1. EarthworksReported 100 % · Certified 100 %22/05/2026 → 01/07/2026
  2. FoundationsReported 100 % · Certified 100 %01/07/2026 → 22/09/2026
  3. StructureReported 15 % · Certified 0 %22/09/2026 → 12/07/2027
  4. MasonryReported 0 % · Certified 0 %12/07/2027 → 11/11/2027
  5. Building servicesReported 0 % · Certified 0 %11/11/2027 → 13/02/2028
  6. Façades and loggiasReported 0 % · Certified 0 %13/02/2028 → 28/04/2028
  7. FinishesReported 0 % · Certified 0 %28/04/2028 → 31/07/2028
  8. CompletionReported 0 % · Certified 0 %31/07/2028 → 07/09/2028
  9. LandscapingReported 0 % · Certified 0 %07/09/2028 → 15/10/2028
  10. TestsReported 0 % · Certified 0 %15/10/2028 → 12/11/2028
  11. HandoverReported 0 % · Certified 0 %12/11/2028 → 10/12/2028

The S-curve

Planned in dashes, reported by the site, certified by the engineer. Where the curves part, there is a question to ask.

0255075100May 2026January 2027August 2027April 2028December 2028
Planned for todayReported by the siteCertified by the engineer

Technical control opinions

The technical control body visits each building at its key stages and gives an opinion. The detailed remarks go to the site; an unfavourable opinion blocks the stage's certification.

Across the site

  • B7 · MasonryFavourable06/11/2026
  • B4 · HandoverFavourable20/10/2026
  • H2-B · HandoverFavourable19/10/2026
  • B11 · FoundationsFavourable29/09/2026
  • B5 · CompletionFavourable with reservations28/09/2026
  • H2-B · TestsFavourable28/09/2026
  • B7 · StructureFavourable with reservations24/09/2026
  • B3 · CompletionFavourable23/09/2026

Next visits

  • B9 · Structure · 11/11/2026 at 10:00
  • B10 · Structure · 15/11/2026 at 10:00
  • B11 · Structure · 22/11/2026 at 10:00

Latest certificates on the site

  • H2-B · Handover · 100 %22/10/2026
  • B4 · Handover · 100 %22/10/2026
  • B11 · Foundations · 15 %02/10/2026
  • B5 · Completion · 92 %30/09/2026
  • H2-B · Tests · 98 %28/09/2026
  • B3 · Completion · 92 %27/09/2026

The site in pictures

The phase 3 site, photographed from the olive-tree park on a weekday morning.

Phase 3 from the park: one building's structure complete, the next one rising beside it.
View 01Phase 3 from the park: one building's structure complete, the next one rising beside it.

Captures recorded for Villas V3-A

  • Site camera · Structure11/11/2026 11:00
  • Site camera · Structure11/11/2026 08:00
  • Drone · Structure03/11/2026 08:40
  • Drone · Structure04/10/2026 08:40
  • Drone · Structure06/09/2026 08:40
  • Drone · Structure05/08/2026 08:40
  • Drone · Structure06/07/2026 08:40

Mock-up Every month a drone flies over the site and fixed cameras photograph each building; each capture is recorded with its date and stage. In this demo the captures are recorded without their files: the photograph alongside shows the phase 3 site.

See the payment schedules tied to the worksSee the homes available now